What happens between the drawing and the box

A supplier evaluation usually comes down to one question: can you make this repeatably? The answer is a process list and a batch record, not an adjective.

Process sequence

StageWhat it covers
Coil windingProgrammable winders with tension control; bobbin and self-supporting types.
AssemblyFrame, plunger, spring and bearing assembly on dedicated fixtures.
EncapsulationPotting or over-moulding where the application needs sealing or damping.
TerminationFly leads, PCB pins, connectors or terminal blocks, strain-relieved.
Test100% electrical screening; sampled mechanical and thermal testing per lot.

Why in-house matters for a solenoid

A solenoid is a small part with a short tolerance chain. The coil resistance, the air gap and the plunger fit all interact: a 0.05 mm change in the gap moves the force curve measurably. When winding, assembly and test sit in different buildings, that interaction is invisible — each supplier meets its own drawing and the assembled part still misses the specification.

Keeping the processes together means a drift in force shows up in the same week it starts, and the cause can be traced to a specific station rather than debated between suppliers.

What we will show on request

  • Process flow for the specific part number
  • Control plan and inspection points
  • Equipment list for the relevant operations
  • Batch records for a delivered lot
  • First article inspection report
Audit visits. Customers are welcome to visit the plant in Qingxi, Dongguan. Ask in advance so the relevant production run can be scheduled for your visit rather than shown as an empty line.